Für eine deutsche Übersetzung Klicken Sie hier


For more information about the product follow the respective links:




Quick start.

 

Getting your Z-Rain up and running is as simple as installing it and linking it to your Z-Wave network. The following instructions tell you how to add your Z-Rain to your Z-Wave network using an existing gateway. 

Installation of Z-Rain and Pair process:
  1. Remove the Cover and Funnel by turning it clock-wise to remove the hood.
  2. Unlatch the Electronic Block.
  3. Install the Batteries into the Electronic Block
  4. Place your gateway or controller into Z-Wave pair or inclusion mode. (Please refer to your controller/gateway manual on how to do this)
  5. Tap the Z-Wave Button on Z-Rain once.
    Your gateway should confirm if Z-Rain is successfully included into your network.
  6. Push the two snap-in noses from the electronics block away to keep the block tight to the base and to avoid any water leakage.