Für eine deutsche Übersetzung Klicken Sie hier
For more information about the product follow the respective links:
Installation
DANGER OF ELECTROCUTION BEFORE ANY INSTALLATION MAKE SURE THE POWER SUPPLY IS DISCONNECTED TO AVOID ANY RISK OF ELECTROCUTION. Directly cut the power supply from the breaker box to avoid any risk of electrocution. This relay switch is designed to be used power-up, a wrong installation can create a fire or an electric shock. If you are not confident about electrical installation, please ask a professional. The relay switch must be installed and connected carefully following the instructions of this user guide. We will not be responsible for any loss or damage resulting from a non-respect of the instructions of this user guide. Cut the power supply before any operation and don’t do any modification if the LED is still ON.
RELAY SWITCH INPUT/OUTPUT
INSTALLATION DIAGRAM FOR OUTLET
- Cut the power supply
- Dismantle the wired switch controlling the light(s) you want to connect.
- Install the Multifunction Relay Switch according to the diagram.
- Reinstall the wired switch.
- Turn the power supply back ON.
AUTO-DETECTION OF SWITCH TYPE
When you turn the power supply ON (via the electrical box for example) once the relay switch is installed, it is necessary to perform a simple action (single press on the button) on the wired switch(es). Automatic detection of the type of switch (monostable or bistable) will then be performed.
Join to Zigbee Network
- When power is turned ON, the relay switch LED will blink orange, looking to join a Zigbee network. Go to your Zigbee gateway app to activate the relay switch detection.
- If the relay switch has correctly joined the network, the LED becomes green. The relay switch is ready for use.
- If the relay switch hasn’t joined a network within 15 minutes, the LED becomes orange. Do a brief press on the relay switch button and start again.
Reset & Remove from Zigbee Network
- Press more than 5 seconds on your module’s button. The LED blinks orange.
- Press the button again (short press) to validate the reset. If the reset is successful, the LED flashes red and green alternately, then flashes orange. Repeat if necessary.
- Your module has returned to its original configuration and is ready to join a new Zigbee network.